Project Profiles

Retail


Horny Toad Harley Davidson Dealership


Project Specs

Square footage: 29,000
Budget: $4,194,707
Location: Temple, Texas

Owner

Knucklehead Properties
George Lee
210.401.5007

Architect

OCO Architects
James Moore
210.823.1737


Client Testimonial

I'm really proud of what we achieved together. MW Builders is focused on safety, quality, and the outcome. I picked the company I thought would do the very best job. I believe they bring enough to the table that they could have done even more for me had I consulted them earlier. They've been there, they've done that, and they made it happen for me.

George Lee


Project Description

The Horny Toad Harley Davidson Dealership was a private project for a retail destination built in Temple, Texas. The owner selected MW Builders for the project over the competition because of their vast experience, the value they brought to the table, and local area knowledge that the team could provide.

This project is a 29,000SF retail Harley Davidson Motorcycle Dealership that encompasses a 13,000SF showroom of motorcycles, gifts, waiting area, and supplies.  There is also a 5,000SF service/maintenance area, a 5,000SF warehouse for storage, and 2,000SF of offices/management suites. Some of the signature elements included a sound proof room housing a dynamometer, a motor cycle training course, an outdoor multi-purpose patio and covered motorcycle parking.

The building structure is a conventional slab on grade with drilled piers, site-cast tilt wall panels, structural steel framing with a membrane roof.  Interior finish-out includes metal-stud wall framing, painted exposed structure, and sealed and stained concrete floor.

The knowledgeable craftsmen at MW Builders self-performed the tilt wall panel casting and erection along with the structural steel erection.