Light Industrial
Titan - Building 1

This project is a 154,057-SF shell building with an exterior skin of concrete tilt wall. The building will contain a continuous dock and overhead door condition and will be fully sprinklered.  Sitework for the new building includes concrete paving of parking and drives, storm drainage system, sanitary sewer to the building, fire water loop, and domestic and fire water to the building. Holcan Drive Extension is an extension of an existing drive from FM 1127, includes a continuous drainage channel through the site, and an extension of water and sewer utilities to the building. 

Additional Project Information

Under Construction

Square Feet: 154,057
Project Location: New Braunfels, Texas
Project Owner: Titan Development
Project Architect: GBA